Portfolio
Starbucks Cathedral Square ...
November 11, 2024
New Starbucks Cafe within Central Christchurch...
Read More
Tapoa Naval Point - Change ...
November 11, 2024
New changing facility at Tapoa Naval Point, Lyttleton...
Read More
Rotorua Hospital – Children...
October 2, 2024
The refurbishment / reconfiguration and modernisation of the Children’s Ward at Rotorua Hospital within the Ngati Whakaue build......
Read More
Rotorua Museum Seismic Stre...
August 30, 2024
Full interior refurbishment and seismic upgrade. Initial works will be inside the building, with roofing and exterior works on ......
Read More
Scene One Apartments | Reme...
August 30, 2024
Building remediation works. Crack injection, replacement & remediation of reinforcement, external painting and balcony repa......
Read More
Woolworths Bureta Park Refu...
August 30, 2024
...
Read More
KFC New Store | Mangere East
August 30, 2024
New Build...
Read More
Albany Primary School
July 4, 2024
The construction build comprised of a structural steel frame with the mid floor level being formed using unispan flat slabs, wi......
Read More
JJ Richards - Waste & Recyc...
March 20, 2024
A single storey building consisting of a two-bay truck workshop, with truck hoist and an adjoining office / staff amenity block......
Read More
Countdown Taupo Central (De...
March 20, 2024
W&H are engaged to carry out demolition works prior to construction of the new Countdown store in Taupo Central....
Read More
I-Med Tauranga Fitout | Ta...
March 20, 2024
New Radiology clinic fit out at Fraser Cove Shopping Centre for I-Med Radiology Network....
Read More
Tauranga Boys College Music...
March 20, 2024
Construction of extension to existing music block, containing 4 acoustic rated practice rooms. Structure is compiled of pre-cas......
Read More
Hamilton Street Development...
February 16, 2024
Commercial Centre in the heart of Tauranga CDB Significant onsite parking Located at 35 Hamilton Street, it is only a six-minut......
Read More
Devonport Road Carpark | Ta...
February 16, 2024
Regrade the existing site and resurface with chipseal and line marking Install approximately 100m of concrete kerbing Install c......
Read More
Perinatal Ward Alterations ...
February 16, 2024
This was the full refurbishment of the Rotorua Hospital Perinatal ward involving new bathrooms, updated suites with new floorin......
Read More
Regent Hotel of Rotorua Ext...
February 16, 2024
The Regent of Rotorua complex is located on the western side of Pukaki Street, within central Rotorua and approximately 450 met......
Read More
KFC Frankton Upgrade
February 15, 2024
The Project was a major upgrade over a very short time frame as due to the nature of the upgrade to store was closed for tradin......
Read More
North Shore District Court
December 13, 2023
This is an existing facility and one of the criteria for this project was that the courts were to remain in operation with as l......
Read More
KFC & Taco Bell, New Stores...
November 27, 2023
New Stores for KFC & Taco Bell...
Read More
Countdown Rangiora Refurbis...
October 27, 2023
Refurbishment & Online Store Extension to Countdown Rangiora...
Read More
Newlands Primary School, De...
August 18, 2023
The School has been identified as requiring roll growth works including the following scope: Construction of a new four teachin......
Read More
Gilmours Hamilton Cold Stor...
August 18, 2023
The Project entailed the full construction of a new standalone freezer room with a chiller also added at the entrance to the fr......
Read More
Kokomea Village Centre | Taupo
August 18, 2023
Development of a new single storey building at 470 Lake Terrace, Taupo, compromising 12 new retail units. The units will be a ......
Read More
Paraparaumu College Gym Ref...
August 17, 2023
The gymnasium changing rooms and toilet facilities will be completely reconfigured and refurbished. All spaces will be modernis......
Read More
Karori Normal School Redeve...
August 17, 2023
Construction of new classroom block consisting of eight teaching spaces (Block N) Block 2: Demolition of WC annex Refurbishment......
Read More
Mihaere Drive DC | Palmerst...
August 17, 2023
Plant Room and amenities building Seismic Upgrade...
Read More
Kawerau Putauaki School Ref...
August 17, 2023
The Administration Block was re-designed to better utilise the existing space and extend the building footprint to allow for th......
Read More
Prebbleton Changing Rooms
June 23, 2023
New changing room facilities at Kakaha Park in Prebbleton, Canterbury....
Read More
Rolleston College Expansion
June 7, 2023
Expansion works to Rolleston College...
Read More
Wairakei School Redevelopment
May 23, 2023
Refurbishment works at Wairakei School...
Read More
Lakes District Health Board...
May 12, 2023
...
Read More
SVS Laboratories Extension ...
May 12, 2023
Project consists of a level 2 addition....
Read More
Mount College Carpark Remed...
May 12, 2023
Remediation and replacement of carpark area....
Read More
Old Omokoroa Pavillion Relo...
April 21, 2023
This project consists of moving the old Omokoroa Pavilion from beside the tennis courts to over beside the main Western Ave Roa......
Read More
Tamatea Intermediate School...
April 21, 2023
Replacement of Portable Modular Classrooms. Blocks, A, C, D, E with a total of 14 teaching spaces approx. 2,198m2 of new build ......
Read More
Tauranga Hospital Renal Unit
April 21, 2023
Construction of a new single storey building to house the Renal Facility, including earthworks and underground services. Refurb......
Read More
Pak n Save - Papamoa
April 21, 2023
Internal refurbishment of the Deli & Bakery areas, external canopies, Online Pick up area, seismic upgrades. Project is a m......
Read More
BAPS Hindu Temple - Naenae
April 21, 2023
Construction of a new Temple...
Read More
Te Whare Hono o Tuwharetoa ...
April 21, 2023
The development consists of a four-storey commercial office building that will accommodate office facilities for the Taupō Dist......
Read More
Greerton Ambulatory
April 21, 2023
The work compromises the fit out of +/- 490 sqm of an existing single-story building situated next to the Greerton Countdown su......
Read More
Countdown Bayfair Loading Y...
April 21, 2023
Extension of the loading yard canopy. Project presented the challenges of working around the stores’ external delivery schedules...
Read More
Countdown Bethlehem Extensi...
April 21, 2023
Project consisted of adding a dedicated Online Pick area, new freezers, internal refurbishment of cosmetic finishes and signag......
Read More
Tasman Holiday Parks – Papa...
April 21, 2023
Design & Build Contract Project consisted of developing a new recreation zone with associated waterplay equipment, hardscap......
Read More
Metlifecare Gulf Rise B5&B6
April 21, 2023
The proposed works if a new build on a green fields site. This is Stage 3 of a 4 stage development and comprises 4,728 m2 of r......
Read More
Te Kura o Matapihi – Tauranga
April 21, 2023
Install one triple modular classroom with a changing room module at Te Kura o Matapihi School. This building is to link in with......
Read More
VTNZ Te Rapa Alterations
February 22, 2023
The Project involved a 250m2 extension to the exiting building which was largely a new open WOF workshop with 2 new vehicle lan......
Read More
Countdown Silverdale Refurb...
February 16, 2023
Interior refurbishment of existing Countdown supermarket....
Read More
Rotorua Hospital Decant War...
February 16, 2023
We completed a full refurb of their Decant Ward, stripping out all finishes including but not limited to the existing ceilings,......
Read More
Mangapikopiko School
January 23, 2023
Design & Build Mangapikopiko School, historically operating as Park Estate School, is now the school’s new re-incarnation, ......
Read More
Woolworths Waimakariri Junc...
December 7, 2022
New Woolworths Supermarket at Waimakariri Junction...
Read More
Elementum | Long Bay Auckland
October 13, 2022
Construction of 107 Apartments, 15 Terrace Homes and 2 Retail spaces on a 8,195m2 site. The development includes 9 buildings ty......
Read More
Metlifecare Greenwich Garde...
October 13, 2022
To undertake all civil works and enabling works to allow the new 51 room independent living unit complex to be constructed on t......
Read More
PakNSave Whakatane Seismic ...
October 13, 2022
Seismic upgrade works to building...
Read More
Northern Quarter Stage 1 & ...
September 21, 2022
New 5,500sqm office and hospitality space in the heart of the Tauranga Central Business District with undercroft parking, inclu......
Read More
KFC Ruakura, New Store | Ha...
July 15, 2022
The site is in a Waikato Tainui development named the ‘Ruakura Superhub’ within which is a Waitomo Group (petrol station) devel......
Read More
New World Whangamata
July 15, 2022
Seismic remediation of an existing supermarket store...
Read More
St Johns Wood Retirement Vi...
July 15, 2022
Watts & Hughes were selected as the main contractor to carry out converting the existing independent living suites into 22 ......
Read More
Countdown Lincoln Road Refu...
July 8, 2022
The project consists of the refurbishment of the existing Supermarket...
Read More
Waiata Shores Medical Centr...
July 8, 2022
The Medical Centre and Radiology fit-out consists of 708m2 area. The Medical Centre is 560m2 and consists of Consult rooms, nur......
Read More
New World Gate Pa Seismic S...
July 8, 2022
Seismic Strengthening of existing supermaket structure....
Read More
Te Puna School | Weathertig...
July 8, 2022
Various weathertightness issues have been identified in several ‘blocks’ and following various invasive and follow up visual in......
Read More
Project Tui | Warehouse & O...
July 8, 2022
This development consists of a 7,442m2 industrial warehouse & office which includes the following spaces: Warehouse – 3,884......
Read More
Westlake Boys High School
May 20, 2022
The building is constructed on shallow strip footings with structural steel frame and double tee suspended floors. A Rooflogic......
Read More
Mitre 10 - Lunn Ave, Mt Wel...
May 20, 2022
This project started with the Demolition of the existing Garden Centre & Café. We then replaced the existing Garden Centre ......
Read More
Christchurch Fresh Distribu...
May 18, 2022
Watts & Hughes have successfully partnered with Woolworths NZ to build their new $60mil Countdown Fresh Distribution Centre......
Read More
Awatere Retirement Village,...
May 10, 2022
Progress Video Above Watts & Hughes has been selected as the main contractor to carry out the construction of the new five ......
Read More
8 Chonny Crescent, Light In...
May 10, 2022
New industrial development. 3 blocks on the site with 11 tenancies...
Read More
KFC Richmond, New Store | N...
May 10, 2022
This is a new 250m2 KFC store, which included siteworks, landscaping and signage. Also included was to remove the redundant roa......
Read More
Red Stag Timber, New Pressu...
May 10, 2022
New PTP#2 Building: The PTP plant and dry storage areas are timber construction with Iron clad walls and roof. The roof will ha......
Read More
Paraparaumu College, Block ...
April 8, 2022
Removal of the original membrane roofing and substrate over changing rooms and corridor/foyer complete replacement including mi......
Read More
Whakatane Hospital, Kitchen...
April 6, 2022
Upgrade and partial refurbishment of the existing Main Kitchen, being Building 09, located within the Whakatane Hospital campus......
Read More
Te Uru Rakau, New Office Bu...
April 6, 2022
Construction of a new single level Commercial Office building, comprising of two tenancies with shared cafeteria, reception &am......
Read More
The Bayview Retirement Vill...
April 6, 2022
Watts & Hughes were selected as the main contractor to carry out the construction of the new three storey 28 apartme......
Read More
Te Puke Primary School, A B...
April 6, 2022
Lite internal refurbishment to school classroom block...
Read More
Evans Bay Intermediate Scho...
April 6, 2022
This project was to replace the metal and membrane roofs on the main teaching block of Evans Bay Intermediate School, and to re......
Read More
Otumoetai Intermediate Scho...
April 6, 2022
Internal upgrade of six classrooms and conversion of existing cloak bays and resource rooms to breakout space to form a more mo......
Read More
Ultimate Motor Group, Ford ...
April 6, 2022
Alterations & upgrade of the existing Ford dealership showroom...
Read More
280 Matakokiri Drive, New W...
April 6, 2022
New 2 storey 4,222m2 warehouse & office building Unit 1 = 773m2 Unit 2 = 2,662m2 Unit 3 = 787m2 Total = 4,222m2...
Read More
KFC Northmall, Upgrade
March 16, 2022
Internal works consists of a general décor upgrade to the restaurant area, cleaning the ceiling tiles, cutting in new floor was......
Read More
Countdown Seismic Upgrades ...
March 16, 2022
Sesimic upgrades at the following existing Countdown stores: Countdown Katikati Countdown Fraser Cove Countdown Greerton Countd......
Read More
Countdown Taupo South, New ...
March 16, 2022
The new 2,358 m2 store will have an extensive fresh food section, bakery, health foods section, cellar, dedicated online Pick-u......
Read More
FMG Stadium WEL Stand, Seis...
March 16, 2022
The Project was largely a seismic upgrade to the FMG WEL stand constructed in 1958. It was aimed to bring the existing stand up......
Read More
Taco Bell Harvard Park
March 2, 2022
New Taco Bell Restaurant at Harvard Park, Christchurch...
Read More
Countdown The Palms 2022 Refit
March 2, 2022
Renewal works to Countdown The Palms...
Read More
Riccarton Primary School Re...
March 2, 2022
Redevelopment works at Riccarton Primary School...
Read More
Countdown Belfast
March 2, 2022
New build of Countdown Supermarket in Belfast Village, Christchurch...
Read More
RETAIL PROPERTY AWARD WINNE...
November 25, 2021
Watts & Hughes were selected as the main contractor to carry out the new 4,000m2 Countdown store construction in Rototuna, ......
Read More
Elmwood Village Development...
November 9, 2021
Watts & Hughes has been selected as the main contractor to carry out the construction of the 102 new bed care centre includ......
Read More
Countdown Regent Extension ...
November 2, 2021
This project involved the extension of an existing Countdown supermarket in Whangarei. The overall store footprint was increase......
Read More
Tuhoe Rangitahi Hub, Taneatua
October 13, 2021
Multi-use facility which includes Medical Suites, Performing Arts Educational spaces & Indoor Gymnasium. The project includ......
Read More
Newtown Community & Cultura...
October 13, 2021
The main features of this re-development included: retaining the buildings heritage features as noted major internal demolition......
Read More
Powerco Hinuera / Lake Road...
October 13, 2021
Carryout the civil installation for the new 33/11kv switchroom & transformer bunding at Hinuera / Lake Road substation....
Read More
Countdown Penrose eStore
October 13, 2021
The site is located within a mix residential commercial zoning. The project is a dedicated online distribution centre serving t......
Read More
Countdown Browns Bay Refurb...
October 13, 2021
External and internal image and branding upgrade (Base Renewal), together with the replacement of the existing refrigeration pl......
Read More
Countdown Moorhouse Ave, Re...
October 13, 2021
Internal modification and refurbishment to the existing supermarket. Construction of a new Grocery Store, a reduced retail trad......
Read More
The Quarter, Industrial Uni...
September 15, 2021
The Quarter is home to 4,997m2 of new industrial units. The 75 units are spilt into 5 blocks (A, B, C, D & E) with 148 park......
Read More
QE Health & Wellness Centre...
September 15, 2021
Construction of the new 3,011.58m2 QE Health & Wellness Centre building. The QE Health & Wellness Centre will provide a......
Read More
37-39 Treffers Road Re-Roof
September 6, 2021
Re-Roof at 37-39 Treffers Road Building...
Read More
Taco Bell - Fairy Springs R...
August 12, 2021
Fitout of an existing building to form a new Taco Bell store....
Read More
Ngakoroa School
July 6, 2021
New School in Drury, Auckland...
Read More
Mt Maunganui College, New W...
June 23, 2021
Whare Kai – Construction of a new 188m2 Wharekai (Main Photo) that will be a multi purpose space for teaching and learnin......
Read More
Taco Bell Bush Inn Fitout
June 10, 2021
Restaurant Fitout at Bush Inn...
Read More
Truman Lane Warehouse & Office
May 19, 2021
The office and workshop development comprised of; General siteworks, driveways and associated landscaping. Construction of a si......
Read More
KFC Tauranga, Upgrade
May 19, 2021
Internal décor upgrade to the restaurant area including ceiling alterations, new lighting, new joinery and upholstery. Works to......
Read More
Baywave Massage Suite & Off...
May 19, 2021
Internal alterations to form 3 massage rooms and administration offices...
Read More
The Antipodean: 39 – 53 Bea...
May 14, 2021
With 161 Apartments, 17 Levels and Ground Level Retail, ‘The Antipodean’ site covers 2100m2. One-third of the units......
Read More
Tranzit Depot - Park Street
May 14, 2021
Watts & Hughes worked alongside Fourways (Tranzit) to design and build two of their new bus service centres and depots. Thi......
Read More
JJ Richards, Lower Hutt Dev...
May 14, 2021
Following a successful project in Auckland for JJ Richards, W&H were selected to deliver this project in Seaview, Wellingto......
Read More
New Zealand Defence Force -...
May 14, 2021
Watts & Hughes were selected under competitive tender as the main contractor to complete the ACTC Hanger 2 Refit at the New......
Read More
New Zealand Defence Force -...
May 14, 2021
Watts & Hughes were selected under competitive tender as the main contractor to complete the NH90 Simulator Building at the......
Read More
Countdown Pioneer Highway P...
May 13, 2021
The new 3,565m2 store will have an extensive fresh food section, bakery, health foods section, cellar, in-store pharmacy, dedic......
Read More
Countdown Waiata Shores Sta...
May 13, 2021
The new 4,200sqm store is filled with environmentally conscious and future-focussed features, it is also Tamaki Makaurau’s firs......
Read More
Everil Orr Retirement Villa...
May 13, 2021
Stage 3 is the latest phase in the redevelopment of the Everil Orr Retirement Village. The current building replaces the curren......
Read More
Novotel Tainui Conference R...
May 12, 2021
Refresh of existing conference rooms, meeting room, lobby & bar areas...
Read More
Te Kauwhata Supermarket
May 12, 2021
The new 1293m2 supermarket, which has replaced the existing Four Square, has grocery, butchery, deli, bakery, produce and liquo......
Read More
Student Accommodation 6-8 U...
May 12, 2021
Demolition of the existing and new construction of an 8,800m2 Student Accommodation building which contains 434 rooms split ove......
Read More
Countdown & Retail Centre, ...
May 12, 2021
Development of a Countdown Supermarket & Retail Centre Block A – Countdown Supermarket (5,354m2), E Store & Retai......
Read More
KFC Colombo Street Upgrade
February 19, 2021
Major Upgrade to KFC Colombo Street, Christchurch...
Read More
Taco Bell Eastgate
February 15, 2021
New Build of Taco Bell Restaurant in Eastgate...
Read More
Lady Allum Care
January 19, 2021
Watts & Hughes has been selected as the main contractor to construct a three-level care at the existing Lady Allum Retireme......
Read More
Apata Coolstore Development...
November 19, 2020
Watts & Hughes have secured the contract for the Stage 1 works at Apata Group on Old Coach Road, Paengaroa. The Stage 1 wor......
Read More
Countdown Hastings New Stor...
November 19, 2020
The new, 3,860m2 store (including 200m2 office & 80m2 plantroom), which will replace the existing Countdown Hastings, will ......
Read More
Bombay Food & Beverage Buil...
November 19, 2020
Watts & Hughes were engaged to carry out the construction of a food beverage and retail complex in the Bombay Hills South o......
Read More
Taco Bell - Taupiri
November 19, 2020
Watts & Hughes were engaged to carry out the full construction of New Zealand’s first stand-alone Taco Bell. The new store ......
Read More
Countdown Gisborne
November 19, 2020
The new, 3,876 sqm store, which will replace the existing Countdown Gisborne, will have an in-store pharmacy, a dedicated onlin......
Read More
Suzanne Aubert Catholic Pri...
November 19, 2020
This project was split into 3 phases, the Admin Building, 2 Classroom Blocks B&C and the Caretakers Shed. The Admin & C......
Read More
Foster Park - Changing Room...
September 15, 2020
New Build of Changing Rooms & Toilets at Foster Park, Rolleston, Canterbury...
Read More
29-31 Beach Road Hotel
July 8, 2020
15 storey boutique hotel at 31 Beach Road in the heart of Auckland’s regenerating Britomart Precinct The contract works include......
Read More
Lot 433 Matakokiri Tauriko
July 7, 2020
The new 1050m2 building consists of 2 industrial units with concrete floors, precast concrete walls and Alucobond & Metalcr......
Read More
Briscoes Morningside - New ...
July 7, 2020
The new Briscoes Morningside store is 1,995m2 of retail space and 700m2 of storeroom. With one entrance off Taylors Road, the n......
Read More
325 Victoria Street Mixed U...
July 7, 2020
Watts & Hughes has been selected as the main contractor to construct a new 540m2 mixed-use building at 325 Victoria Street ......
Read More
Eden Retirement Village Exp...
July 7, 2020
Watts & Hughes were selected as the main contractor to carry out the construction of 49 new independent living units over 3......
Read More
CAL Isuzu - Partial Demo & ...
July 7, 2020
Extension to the existing CAL Isuzu Trucks building which houses a new part store room and sales area...
Read More
KFC Porirua Rebuild
July 7, 2020
KFC Porirua consisted of the complete demolition of the existing store and new rebuild. The new store consisted of a POD slab o......
Read More
Woolworths NZ Ltd - Palmers...
July 6, 2020
The project consists of 39,000m2 of warehouse and 2,000m2 of offices and ancillary structures, total earthworks area of 139,000......
Read More
Awatere Retirement Village,...
July 6, 2020
Watts & Hughes were selected as the main contractor to carry out the construction of 63 new apartments, associated faciliti......
Read More
Omokoroa Sports Pavilion & ...
July 6, 2020
Watts & Hughes were selected as the main contractor to carry out the construction of the new 2 level Sport Pavilion, Commun......
Read More
Bayview - Stage 2
July 6, 2020
Watts & Hughes has been selected as the main contractor to carry out the addition of 74 new apartments & associated com......
Read More
CHT Healthcare Trust
July 6, 2020
Watts & Hughes were selected as the main-contractor to carry out the redevelopment and extension of the existing CHT Acacia......
Read More
Doubletree By Hilton
July 6, 2020
The 120-room building is located at New Zealand Bloodstock’s sales centre, on the corner of Hingaia Road and Hinau Road, ......
Read More
Scion Hub Development Rotor...
July 6, 2020
The Hub consists of 1835m2 GFA of new build. The Building connects with existing Blocks L, H & E and includes the alteratio......
Read More
Sebel Hotel | Lower Hutt We...
July 6, 2020
Brand new 4.5 Star apartment style hotel situated at the southern end of Lower Hut CBD between Hutt River and Civic Centre. 60 ......
Read More
Wainuiomata Countdown & Sho...
July 6, 2020
The new Countdown supermarket will be 3600m2 and designed with a focus on energy efficiency, including electric vehicle chargin......
Read More
Toll Networks New Depot & O...
July 3, 2020
This project consisted of the construction of a freight forwarding facility encompassing a 8,500m2 warehouse, 400m2 office, 970......
Read More
Alpha Street Mixed Use Deve...
July 3, 2020
Completed December 2020 Client: Alpha Street Developments The project consisted of the construction of an approximate 2400m2 3 ......
Read More
Northbridge Residential Vil...
June 23, 2020
This stage 3 consists of a Basement car park linking to the stage 2 complex of over 60 cars, with individual unassisted apartme......
Read More
Countdown Hornby
May 14, 2020
Supermarket Alterations to the existing Countdown in Hornby, Christchurch...
Read More
Countdown Greymouth
May 14, 2020
Seismic Bracing works at Countdown Greymouth...
Read More
Kaiapoi East Changing Rooms...
May 14, 2020
Design & Build of a new Changing Room & Toilet Facility in Kaiapoi, Canterbury...
Read More
Western Refuse Transfer Sta...
February 21, 2020
This heavy duty Industrial purpose Warehouse project consisted of 2 Stages....
Read More
Stonefields School
February 21, 2020
This Design and build project consists of a new teaching block to existing fully operational School....
Read More
NZDF Whenuapai -Project Raki
February 20, 2020
Stage 1 – Enabling Site Works. Stage 2 – Foundations for Admin and Q-Store buildings, including 6 Barrack Buildings, 3 Ablution......
Read More
Clayton Park School
February 20, 2020
This redevelopment included, 2 new Two-storey Learning Blocks, New sports courts, associated site work works and demolition of ......
Read More
St Albans Community Centre
February 14, 2020
New build of the St Albans Community Centre, Christchurch...
Read More
Pioneer Sports Facility Sta...
February 14, 2020
Re-Roof & Services Works to Pioneer Sports Facility, Christchurch...
Read More
Countdown Rolleston Refurbi...
February 14, 2020
Refurbishment of Countdown Rolleston, Canterbury...
Read More
Pizza Hut Barrington Fitout
January 14, 2020
Pizza Hut Fitout at Barrington Mall, Christchurch...
Read More
Okains Bay School
January 14, 2020
Classroom Refurbishment to Okains Bay School in Akaroa, Canterbury...
Read More
Duvauchelle School
January 14, 2020
Classroom Refurbishment at Duvauchelle School in Akaroa, Canterbury...
Read More
Auckland High Court Registr...
August 21, 2019
Court Registry refurbishment and Basement upgrade...
Read More
Fresh Choice Parklands
May 29, 2019
Refurbishment to the Parklands Supermarket, Christchurch...
Read More
Left Bank Art Gallery
May 28, 2019
Structural Strengthening to the Left Bank Art Gallery in Greymouth...
Read More
Te Waka Unua School
May 28, 2019
Landscaping works at Te Waka Unua School, Christchurch...
Read More
Sheffield Hall Structural
May 28, 2019
Seismic Upgrade to the Sheffield Hall, Canterbury...
Read More
Social Housing Programme - ...
May 28, 2019
Earthquake Refurbishment/Repairs to 6 Social Housing Complex's throughout Christchurch...
Read More
Opawa Library Design & Build
May 28, 2019
New Library Design & Build...
Read More
HP Smith Courts
May 28, 2019
EQ Refurbishment & Repair Works to Social Housing Complex...
Read More
Manuka Cottage
May 28, 2019
Design & Build of New Community Facility in Addington, Christchurch...
Read More
Nuclear Medicine Unit Refur...
May 28, 2019
Nuclear Medicine Unit Refurbishment Works at the Christchurch Hospital...
Read More
Lot 4, Waterloo Business Pa...
May 28, 2019
2 New Warehouses at Waterloo Business Park, Christchurch...
Read More
Riccarton Community Centre
May 28, 2019
New build of Riccarton Community Centre, Christchurch...
Read More
Social Housing - East & Wes...
May 28, 2019
Earthquake Refurbishment & Repair Work to Social Housing Complexes, Christchurch...
Read More
Burnham Defence Health Centre
August 8, 2018
Upgrade works to the Burnham Camp Health Centre, Canterbury...
Read More
Waipara School
August 8, 2018
Classroom Modifications at Waipara School, Canterbury...
Read More
106 High Street - Commercia...
August 8, 2018
Commercial / Retail New Build in Rangiora, Canterbury...
Read More
Christchurch Airrport Wareh...
August 8, 2018
New build of two warehouses located in Dakota Park at Christchurch International Airport...
Read More
St John & Vincent Courts (S...
August 8, 2018
Earthquake Repairs to Social Housing Complexes, Christchurch...
Read More
Lancewood Courts (Social Ho...
August 8, 2018
Earthquake Repairs to a Social Housing Complex, Christchurch...
Read More
Huggins Place (Social Housing)
August 8, 2018
Earthquake Refurbishment works to a Social Housing Complex, Christchurch...
Read More
Division Engineering Wareho...
August 7, 2018
New build of Office & Warehouse in Kaiapoi, Canterbury...
Read More
Countdown Church Corner Sei...
August 7, 2018
Structural Strengthening of an existing Countdown Supermarket at Church Corner, Riccarton, Christchurch...
Read More
Bruce Terrace Design & Buil...
August 7, 2018
New Social Housing Complex in Akaroa, Canterbury...
Read More
Akaroa Health Hub
August 7, 2018
New build of the Akaroa Health Hub facility, Canterbury...
Read More
IAG Residential Rebuild - 1...
August 7, 2018
Earthquake Repair works to a IAG Residential property, Christchurch...
Read More
Spencerpark Campground Amen...
August 7, 2018
New Amenities Block at Spencerpark Campground, Canterbury...
Read More
Countdown Rolleston Pharmacy
August 7, 2018
New Pharmacy at Countdown Rolleston, Canterbury...
Read More
BMW Mini Showroom
August 7, 2018
New 2 Storey BMW Mini Showroom, Christchurch...
Read More
Wigram Airforce Museum
August 7, 2018
HVAC Upgrade & Full Re-Roof of Hanger at Wigram Museum, Christchurch...
Read More
Everil Orr Village Stage 2
July 24, 2018
Stage 2 consists of a 4 level apartment block The project has Basement parking & 3 levels of 1 & 2 bedroom self-contai......
Read More
Auckland University, Auckland
October 17, 2017
This project provided for the complete demolition and refurbishment of 3 lecture theatres and associated areas for the Universi......
Read More
Countdown Seizmic Upgrades,...
October 4, 2017
...
Read More
KMart Upgrades, National
October 4, 2017
...
Read More
Bethesda Village Apartments...
October 4, 2017
This new Apartment building contains 36 Apartments over 4 levels. There are 1,2 and 3 bedroom apartments all constructed with l......
Read More
Everil Orr Village, Auckland
October 4, 2017
This $14.3M project started in July 2016 with a completion in November 2017. It consists of 217 residential units, where the ma......
Read More
The Gate, Auckland
October 4, 2017
The project comprises of a 4500m2 warehouse, built from structural steel frame, with precast concrete panels framing the outer ......
Read More
Freemans Bay School, Auckland
October 4, 2017
Construction has begun to put Freemans Bay School at the forefront of modern learning. The new redevelopment will see the scho......
Read More
Koru School, Auckland
October 4, 2017
This $15.3M redevelopment project replaces the existing classrooms and provides new, innovative learning spaces to accommodate ......
Read More
Intercontinental Hotel Refu...
October 4, 2017
The refurbishment works involved the closure of one floor level at a time consisting of approximately 32 rooms across five floo......
Read More
Harbour City Asset Management
October 4, 2017
This project involved the installation of new partition framing and high end finishes for a new client on a previously empty te......
Read More
Craigs Investment Partners
October 4, 2017
Craigs Investment Partners contracted Watts & Hughes to complete an internal fitout of their offices in Wellington. The cli......
Read More
Archives NZ Film Processing...
October 4, 2017
The project consisted of constructing a film processing/restoration lab within the existing building. The original design of th......
Read More
Mt Cook School Gymnasium
October 4, 2017
This project involved the construction of a new architecturally designed 400 m2 school sports hall at Mt Cook School, Tory Stre......
Read More
Countdown Aotea New Design-...
October 4, 2017
...
Read More
Countdown Cable Car Lane Ex...
October 4, 2017
...
Read More
Porirua College Stage 4 Eas...
October 4, 2017
...
Read More
Countdown Cable Car Lane
October 4, 2017
...
Read More
Sofitel Hotel Extension
October 4, 2017
...
Read More
Te Awamutu Post Office
October 4, 2017
The project included the demolition of the existing structure, the construction of a new structure, new carpark and the refurbi......
Read More
Countdown Whitianga
October 4, 2017
Progressive Enterprises contracted Watts & Hughes to build this unique, new Countdown supermarket in Whitianga. It is uniqu......
Read More
Countdown Claudelands
October 4, 2017
Watts & Hughes Construction was selected as the main contractor to complete the construction of a new Countdown supermarket......
Read More
Countdown Bridge Street
October 4, 2017
This new 4,000 m2 Countdown was constru ted on an existing Countdown site. The existing supermarket was demolished by Watts &am......
Read More
Ibis Tainui Hotel
October 4, 2017
The hotel's accommodation floor area is 575m2 per floor, with a bathroom area of just over 3m2 per room. The eight-level, 126-r......
Read More
Waterworld (Ceiling & D...
October 4, 2017
The project encompassed the renovation of the roof structure and ceiling to the Olympic size pool and dive tower. This included......
Read More
Waterworld (Hydroslide)
October 4, 2017
This project involved the construction of two speed slides, two hydroslides plus a children's play area. Work on this project w......
Read More
Tairua Marina Club Room
October 4, 2017
Watts & Hughes were selected as the main contractor to build the new Tairua Marina Clubroom Building. This building houses ......
Read More
Cancer Society Lion Lodge
October 4, 2017
This project entailed the remodelling of the existing wing of 994 m2 that was retained from the former Braemar Hospital purchas......
Read More
Ricketts Road
October 4, 2017
This was a challenging project as focus needed to be maintained on the programme. This project went well and was completed on t......
Read More
Tairua Library
October 4, 2017
The project entailed the construction of a single storey library building consisting of the main library area, kitchen, two toi......
Read More
Department of Corrections
October 4, 2017
An existing building requiring a 240 m2 extension to the existing mezzanine floor. The entire building was refurbished with new......
Read More
6 Bryce Street
October 4, 2017
The existing three-level building was constructed on a sloping site with reinforced concrete floors, structural steel and timbe......
Read More
Horsham Downs School
October 4, 2017
The major portion of the work was completed during the school holidays in order to minimise disruption to the students and teac......
Read More
TSB Bank
October 4, 2017
This was the first TSB Bank project for Watts & Hughes and the first for the region. The project encompassed the utilisatio......
Read More
Southern Tenancies, "The Base"
October 4, 2017
Construction of three highly detailed tenancies with exposed steel members, architectural concrete feature columns and glass ca......
Read More
Heathcote Appliances
October 4, 2017
The building was constructed mainly from structural portal frames with a pre-cast panel exterior. Watts & Hughes Constructi......
Read More
Knox Street Car Park
October 4, 2017
This stylish modern parking complex was started in July 2005 and was completed in April 2006. It provides 460 additional parkin......
Read More
Tairua Marina Villas
October 4, 2017
The Marina Villas comprise 7 two storey luxury dwellings, each with three bedrooms, two plus bathrooms and double garage and fu......
Read More
Countdown Dinsdale External...
October 4, 2017
...
Read More
Kerepehi Seismic Strengthening
October 4, 2017
...
Read More
Waikato Stadium Corporate B...
October 4, 2017
...
Read More
Rebel/Briscoe's Stockroom E...
October 4, 2017
...
Read More
KFC The Mount
October 4, 2017
This project entailed the demolition of the existing KFC building and construction of a new 361m2 KFC Restaurant, 26 vehicle ca......
Read More
KFC Papamoa
October 4, 2017
This KFC restaurant was a new build on a bare site.
The structure consits of a slab on grade with a combination of structura......
Read More
KFC Gate Pa
October 4, 2017
This project entailed the renovation and extension of an existing building for a new KFC Restaurant. The existing building was ......
Read More
KFC Cameron Road
October 4, 2017
This project included the demolition of the existing KFC Restaurant, clearing the site including the car parking ares and const......
Read More
Eat Street
October 4, 2017
Watts & Hughes are proud to have completed this project which was awarded the NZ Wood Timber Design Commendation for Exteri......
Read More
30 Domain Road Retail
October 4, 2017
Watts & Hughes was selected to construct two single-level tenancies at 30 Domain Road, Papamoa—a site that has shared car p......
Read More
The Pacific Apartments
October 4, 2017
Comprising 68 apartments the building has a gross floor area 8,100 m2 plus underground car parking, with views over Pilot Bay, ......
Read More
Mangatawa Housing
October 4, 2017
This was a design & build project in which Watts & Hughes was heavily involved and whatever changes were made to the de......
Read More
Birley Town House
October 4, 2017
The three-story residential building has a total floor area of 578.2 square meters. It is founded on a 350mm thick concrete flo......
Read More
Whakatane Aquatic Centre
October 4, 2017
The Whakatane Aquatic Centre required leaky building remedial works where the entire building had to be re-roofed, the exterior......
Read More
St Mary's Star of the Sea
October 4, 2017
The construction included the remodelling of the existing church facilities with the inclusion of a new floor, new extension an......
Read More
AC Baths Stage 2 Refurbishment
October 4, 2017
The stage 2 refurbishment of the AC Baths in Taupo included works to an existing building which houses a leasure pool, a learn-......
Read More
Anson House
October 4, 2017
The remedial works to Anson House in Tauranga entailed the re-roofing as well as an exterior re-cladding of the building ensuri......
Read More
Otamarakau Wharekai Develop...
October 4, 2017
This contract was a new build of a Wharekai, with a large commercial kitchen. This project was a very exciting one for Watts &a......
Read More
BOP Cricket New Pavilion
October 4, 2017
Watts & Hughes Construction was engaged to build the new cricket pavillion for the Bay of Plenty Cricket Trust at Blake Par......
Read More
Whakatane Vet Clinic
October 4, 2017
This is a new single level commercial building premises for Vets 4 Pets Limited. The building structure consists of blockwork p......
Read More
Whakatane Hospital
October 4, 2017
Stage 1: Learning Centre: $1.20 million:
An existing building which had previously been relocated from Tauranga Hospital was r......
Read More
Te Kainga Te Puna Whaiora C...
October 4, 2017
This was a new facility constructed in Gisborne on a design & build basis which included the construction of a new Administ......
Read More
Rotorua Health Camp
October 4, 2017
This project consisted of a major refurbishment and extension to the existing health camp facility as well as the construction ......
Read More
Grace Hospital
October 4, 2017
This job comprised a 500m2 addition being a radiology wing and a remodel of the main loading dock. This was added onto the exis......
Read More
Bethlehem Medical Centre
October 4, 2017
This building was constructed primarily with a light commercial ground floor slab, insitu columns on bearing pads up to first f......
Read More
Porter Hire
October 4, 2017
Watts & Hughes built a new building for Porter Hire Limited Gisborne which houses their new workshop of 186 m2, a reception......
Read More
Montana Wines (Stage II)
October 4, 2017
The construction of the Marc Bunker as well as the receival and press areas on their Penfolds site consisted of the installatio......
Read More
Eastpack Te Puke
October 4, 2017
The Client required the construction of a new 1,578 m2 coolsotre with a structural steel frame to support a condensing unit wit......
Read More
Eastpack Opotiki
October 4, 2017
This project entailed the construction of a new 1,884 m2 coolstore, a new 410 m2 canopy extension, the enclosure of an existing......
Read More
Eastpack Edgecumbe
October 4, 2017
The Client required the construction of a new metal-clad, timber wall within an existing canopy area in order to enclose and ex......
Read More
Doosan
October 4, 2017
This project consisted of the construction of a new workshop with offices. The workshop consisted of a concrete slab including ......
Read More
Bidvest Coolstores
October 4, 2017
This project entailed the construction of a new 2,840 m2 food distribution centre. The building consisted of the following area......
Read More
Rotorua Museum of Art &...
October 4, 2017
This project entails the Stage 3 extension of the museum where a new wing is being added which has to match the existing buildi......
Read More
Youth Justice Central
October 4, 2017
The construction of eight new buildings on a green site located in Rotorua. This project will provide a completely secure, self......
Read More
Tauranga Art Gallery
October 4, 2017
The old BNZ building, which is the new home for the Tauranga Art Gallery had to undergo significant demolition and re-strengthe......
Read More
TECT All Terrain Park
October 4, 2017
The TECT All Terrain Park project consisted of the construction of the visitor centre buiding and adjoining ablution facilities......
Read More
Rotorua Public Library
October 4, 2017
Redevelopment and expansion of the existing Rotorua Public Library, encompassing alterations to three levels at the existing bu......
Read More
Rotorua Civic Theatre
October 4, 2017
The existing stage had to be demolished and rebuilt from the 'front of stage'. The project also included a partial demolition a......
Read More
Pilot Bay (Amenities Upgrade)
October 4, 2017
The project involved the upgrading of the existing ablution facility at Pilot Bay.
Externally new windows, doors, benches an......
Read More
Mount Camp Ground
October 4, 2017
Oceanside: The existing building housing a kitchen, laundry and ablution facilities was demolished and a new building erected o......
Read More
Huharua Public Toilet
October 4, 2017
The building is a colonial styled toilet block featuring two disabled toilet cubicles. An environmentally friendly Devan septic......
Read More
Gisborne Police Station
October 4, 2017
This project is situated in one of Gisborne's prime locations. The design and construction for this project were based on retai......
Read More
Gisborne Court House
October 4, 2017
The building construction consisted of various external cladding types including Etterpan, Monotek and decorative metal cla......
Read More
Westpac Papamoa
October 4, 2017
Externally this project consisted of a new canopy extension to provide cover to the external ATM monies machine as well as exte......
Read More
The Phoenix Bar & Resta...
October 4, 2017
This project entailed the fitout of The Phoenix restaurant which was undertaken after the initial project had been completed.
...
Read More
SCION Research Upgrade of L...
October 4, 2017
This project entailed extensions, alterations and fitout to the existing facility.
The remainder of the facility had to rema......
Read More
Gordon Pilditch
October 4, 2017
This fitout project consisted of the internal fitout for the Gordon Pilditch Lawyers located at 1144 Pukaki Street in Rotorua. ......
Read More
Fischer & Fischer Optom...
October 4, 2017
This was a shop fitout within an existing building. The clients were on a very tight budget and required the most efficient use......
Read More
TKKM o Nga Uri a Maui
October 4, 2017
This school redevelopment was constructed over a 12-month period and completed in December 2013. The project was completed five......
Read More
Sorise Christian School
October 4, 2017
The construction of the Sonrise Christian School Administration Building and Library including the infrastructural work had to ......
Read More
Omokoroa Point School
October 4, 2017
With this project Watts & Hughes combined two old classrooms by removing the centre wall and demolishing an adjoining toile......
Read More
Omanu School
October 4, 2017
The project consisted of the construction of a new classroom with two adjoining withdrawal rooms. The construction was of light......
Read More
Mount Maunganui College
October 4, 2017
This was a staged project with Stage 1 involving classroom relocation and construction of a new classroom block. Stages 2 and 3......
Read More
Katikati Primary School
October 4, 2017
Watts & Hughes Construction was engaged to remove four existing classrooms off site and to spin Classroom 25 around and con......
Read More
Gisborne Boys' High School
October 4, 2017
This project entailed the demolition of an existing gymnasium and the construction of a new multi-structure including a link to......
Read More
Bethlehem Primary School Ne...
October 4, 2017
This was a new build encompassing seven open plan classrooms with autex wall covering, carpet tiles, concrete ring foundation f......
Read More
BOP Polytec
October 4, 2017
This project consisted of the construction of a new 2 storey 3,198 m2 engineering building (Block J) for the Bay of Plenty Poly......
Read More
The Gym
October 4, 2017
The client procured what was previously the Guinness Appliances Building in 1st Ave Tauranga. This provided the client with a l......
Read More
Tauranga Intermediate
October 4, 2017
This was a design & build project where the ground floor areas included a 100m2 multi-purpose room with an adjacent semi-co......
Read More
Maketu Hauora Health & ...
October 4, 2017
This was a design build from the earliest possible point when Watts & Hughes Construction was approached by the client in M......
Read More
Freshchoice Omokoroa
October 4, 2017
For the Omokoroa Fresh Choice design-build, the second Fresh Choice store built by Watts & Hughes—the first being in Christ......
Read More
Apata New Coolstore 9, 10 &...
October 4, 2017
Watts & Hughes was selected as the main contractor to carry out the design build of Coolstore 9 for the Apata Group. This p......
Read More
Timberlands Office Building
October 4, 2017
A stunning new office facility housing 64 permanent staff. The single storey office building has a floor area of 1,650 m2. Foun......
Read More
Sharpac Building
October 4, 2017
This project consisted of a six-level commercial office building with two levels of underground car parking, which was purpose-......
Read More
Benchmark Building
October 4, 2017
This project entailed the conversion of an existing building into a two storied office development, suitable for two or three t......
Read More
BNZ 639 Cameron Road
October 4, 2017
This project consists of a two-level commercial office building which has been purpose-built for the Bank of New Zealand. The c......
Read More
Pillans Point School New 9-...
October 3, 2017
Fantail Block Alerations. The works include the internal reconfiguration of existing spaces to create breakout space, upgrade a......
Read More
Papamoa Plaza Stage 2B
October 3, 2017
...
Read More
306 Cameron Road New Office...
October 3, 2017
The project description was the existing 4 storey building was to have all floors fitted out for the new council temporary offi......
Read More
Hunting & Fishing Exten...
October 3, 2017
The project consisted of extending the existing store by 335m2 in what was a carpark area. Many of the shopping services entere......
Read More
Whakatane Hospital Central ...
October 3, 2017
The project description was the existing 5 storey central core building formed an integral part of the old Hospital, but had be......
Read More
Elizabeth Street Carpark Ex...
October 3, 2017
...
Read More
IRD Rotorua Fitout
October 3, 2017
...
Read More
Tauranga Sensory Resource C...
October 3, 2017
The development consisted of a building for a resourcing centre that caters the deaf & blinds resourcing managers to have a......
Read More
Eat Street Roof Access
October 3, 2017
...
Read More
Historic Village Cinema Ref...
October 3, 2017
The council had the Asbestos removed around the base of the Detour Theatre and then engaged Watts & Hughes to install new w......
Read More
Western Heights High School...
October 3, 2017
...
Read More
Heathcote Community Centre
October 3, 2017
Design & Build of a new Community Centre in Heathcote, Christchurch.
...
Read More
Aranui Community Centre
October 3, 2017
New build of a Community Centre in Aranui, Christchurch...
Read More
New Brighton Library
October 3, 2017
Seismic Strengthening & Repair work to the New Brighton Library. Christchurch.
...
Read More
Linfield Recreational &...
October 3, 2017
Seismic Strengthening works to Linfield Recreational Centre, Christchurch
...
Read More
Clearview School Changing Shed
October 3, 2017
Construction of a Changing Shed at Clearview School, Canterbury...
Read More
Weedons School Accessible B...
October 3, 2017
Refurbishment of Classrooms & Addition of Accessible Bathroom at Weedons School, Canterbury...
Read More
Addington Primary Enabling ...
October 3, 2017
Stage 1 Enabling Works at Addington Primary School, Christchurch
...
Read More
Christchurch Boys High Scho...
October 3, 2017
Seismic Strengthening & Upgrade works to the Christchurch Boys High Deans Farm Building
...
Read More
Christchurch Girls High Sch...
October 3, 2017
Construction of an extension to the existing Christchurch Girls High School Gymnasium.
...
Read More
Glassworks Industrial Park ...
October 3, 2017
Construction of new warehouses in Glassworks Industrial Park, Christchurch
...
Read More
Carls Junior Restaurant Fitout
October 3, 2017
New Carls Junior restaurant fitout in the Bush Inn Centre, Christchurch...
Read More
Countdown Church Corner Pha...
October 3, 2017
Pharmacy Fitout at Countdown Church Corner, Christchurch ...
Read More
Countdown Eastgate Pharmacy...
October 3, 2017
Pharmacy Fitout at Countdown Eastgate, Christchurch...
Read More
La Di Da Cafe Fitout
October 3, 2017
High end architectural cafe fitout on Victoria Street, Christchurch
...
Read More
Kmart Riccarton Fitout
October 3, 2017
Fitout works at K-Mart Riccarton, Christchurch ...
Read More
MBIE Office Fitout
October 3, 2017
Office fitout of the MBIE Building on Lincoln Road, Christchurch...
Read More
Opus House - Office Fitout
October 3, 2017
Office Fitout of the new Opus Building, Christchurch...
Read More
Placemakers Antigua Street ...
October 3, 2017
New show room and refurbishment of Placemakers Antigua Street, Christchurch
...
Read More
Little India Restaurant
October 3, 2017
Fitout of Little India restaurant at Spitfire Square, Christchurch Airport
...
Read More
Chateau on the Park Hotel
October 3, 2017
Interior Refurbishment of the Chateau on the Park Hotel, Christchurch...
Read More
71 Gloucester Street Office...
October 3, 2017
New 3 Storey Office Building on Gloucester Street, Christchurch
...
Read More
Opus House Base Build
October 3, 2017
New 5 Storey Office Building on Moorhouse Ave, Christchurch
...
Read More
IAG Residential Repairs - 2...
October 3, 2017
Earthquake Repair works to a IAG Residential Property in Christchurch...
Read More
IAG Residential Repairs - 1...
October 3, 2017
Earthquake Repair works to a IAG Residential Property in Christchurch ...
Read More
278 Gloucester Street - Com...
October 3, 2017
Seismic Upgrade to Housing New Zealand Units in Christchurch
...
Read More
34 Hansons Lane - Community...
October 3, 2017
Upgrade of 14 Housing NZ Units in Upper Riccarton, Christchurch
...
Read More
Housing NZ Portfolio, Chris...
October 3, 2017
Earthquake strengthening works to existing Housing NZ residential units throughout Christchurch
...
Read More
HNZ Seismic Upgrade Package 3
October 3, 2017
Seismic Upgrade to Housing New Zealand Units in Christchurch...
Read More
Veronica Place (Social Hous...
October 3, 2017
Upgrade / Earthquake Repair works to a Social Housing Complex in Christchurch...
Read More
KFC Rolleston
October 3, 2017
New Build of a KFC Restaurant in Rolleston, Canterbury...
Read More
Countdown Ashburton
October 3, 2017
New Countdown supermarket Store in Ashburton, Canterbury ...
Read More
Countdown Structural Upgrad...
October 3, 2017
Fast track structural earthquake upgrade works to existing Countdown Supermarkets throughout the South Island...
Read More
KFC South Island Wide Refur...
October 3, 2017
Refurbishment of existing KFC Restaurants throughout South Island
...
Read More
Supervalue Fendalton
October 3, 2017
Seismic Upgrade works to the Supervalue Supermarket in Fendalton, Christchurch
...
Read More
KFC Greymouth
October 3, 2017
Refurbishment of the existing KFC Building in Greymouth
...
Read More
KFC Papanui
October 3, 2017
New build of a KFC Restaurant in Papanui, Christchurch
...
Read More
Placemakers Antigua Street
October 3, 2017
Structural strengthening of the Placemakers Warehouse on Antigua Street, Christchurch
...
Read More
Pegasus Town Centre
October 3, 2017
Commercial new build in Pegasus, Canterbury
...
Read More
Countdown New Brighton
October 3, 2017
Structural Earthquake Upgrades to Countdown New Brighton, Christchurch...
Read More
KFC Eastgate
October 3, 2017
New build of a KFC Restaurant in Eastgate, Christchurch
...
Read More
Carls Junior Hornby
October 3, 2017
New build of a single storey Carls Junior Restaurant in Hornby, Christchurch...
Read More
Farmers Rangiora
October 3, 2017
Construction of a new 2 storey Farmers Building in Rangiora, Canterbury
...
Read More
Countdown Ferrymead
October 3, 2017
New build of a Countdown Supermarket in Ferrymead, Christchurch
...
Read More
Fresh Choice Barrington
October 3, 2017
Refurbishment/upgrade of the existing Fresh Choice Barrington Supermarket, Christchurch...
Read More
Packhorse Hut
October 3, 2017
Earthquake Strengthening Work to Packhorse Hut, Canterbury...
Read More
Rolleston Police Station
October 3, 2017
Construction of new single story Police Station in Rolleston, Canterbury
...
Read More
KFC Christchurch Airport
October 3, 2017
New build of KFC Restaurant at Spitfire Square, Christchurch Airport...
Read More
Countdown Kaiapoi
October 3, 2017
Refurbishment works to Countdown Kaiapoi, Canterbury...
Read More
Countdown Timaru
October 3, 2017
Refurbishment works to Countdown Timaru, Canterbury...
Read More
Mary McLean Place (Social H...
October 3, 2017
Earthquake Repairs to a Social Housing Complex in Christchurch...
Read More
IAG Residential - 518 Marin...
October 3, 2017
Earthquake Repairs to a IAG Residential Property in Christchurch...
Read More
IAG Residential - 73 Fairfi...
October 3, 2017
Earthquake Repairs to a IAG Residential Property in Christchurch...
Read More
Nellie Nightingale Library
October 3, 2017
Refurbishment works to the Nellie Nightingale Library in Nelson...
Read More
Steel & Tube Warehouse/Office
October 3, 2017
New Build of a Steel & Tube Warehouse/Office at Glassworks Industrial Park, Christchurch...
Read More
Akaroa Fire Station
October 3, 2017
Earthquake Strengthening Works to Akaroa Fire Station, Canterbury...
Read More
Christchurch Wastewater Tre...
October 3, 2017
Restoration of the Christchurch Wastewater Treatment Plant...
Read More
Addington Primary School
October 3, 2017
Refurbishment Works & New Education Block at Addington Primary School, Christchurch...
Read More
Westmount School, Timaru
October 3, 2017
Construction of a new Westmount School Campus in Timaru...
Read More
Waitakere Plaza, Waitakere ...
October 3, 2017
The work of this project comprised the refurbishment and addition of a total 13,000 m2 retail area to an existing shopping cent......
Read More
Harvey Norman Centre, Mt We...
October 3, 2017
This project comprised the construction of a retail shopping centre for Harvey Norman, five other tenancies and one stand-alone......
Read More
Countdown Pukekohe, Auckland
October 3, 2017
The construction of this project comprised a new 4500sqm Countdown including car parking.
...
Read More
Clendon Shopping Centre (St...
October 3, 2017
Stage III of the Clendon Shopping Centre was constructed in the parking area of the original Mall.
Although these works did ......
Read More
Clendon Shopping Centre (St...
October 3, 2017
This work included major alteration, extensions and refurbishment of an existing shopping centre in Clendon, South Auckland.
......
Read More
Oak Junction Stage 2, Auckland
October 3, 2017
This project consisted of the base build of 3 retail units to compliment Stage 1 and included 22 car parks
...
Read More
Oak Junction Stage 1, Auckland
October 3, 2017
This project consisted of a retail and commercial development of a Tier 2 Z Energy Station (included 2 pumps and a retail store......
Read More
K Drive - Stage 2 Retail, H...
October 3, 2017
TBC
...
Read More
Coombes Johnson BMW, Hamilton
October 3, 2017
Coombes Johnston BMW needed an extended workshop, so this project consisted of a workshop extension for six cars and included t......
Read More
Z Rotokauri, Auckland
October 3, 2017
This project consists of a new Z Service Station, shop and forecourt.
...
Read More
Z Clevedon, Auckland
October 3, 2017
This project consists of a new Z Service Station, shop and forecourt.
...
Read More
Z Kahikatea Hamilton, Hamilton
October 3, 2017
This project consists of a new Z Service Station, shop and forecourt.
...
Read More
Dressmart Onehunga, Auckland
October 3, 2017
This project consisted of a 1000m2 extension to the existing Dress Smart shopping centre. The project was very demanding as th......
Read More
BMW Mini, Auckland
October 3, 2017
This project consists of a new sales area, showroom and workshop. Constructed of incitu concrete and precast concrete. This pro......
Read More
Albany Mixed Use Developmen...
October 3, 2017
Compromising four blocks of mixed retail outlets, that consisted of Restaurants, offices, café’s, Childs Day-care, Gym, hairdre......
Read More
Bay Plaza, Hastings
October 3, 2017
Install of new aluminium shop front, sub dividing existing tenancies and installing new services to suit. External painting of ......
Read More
Countdown Papakura, Papakura
October 3, 2017
Retail light fixtures are dimmable as an energy saving feature to take advantage of natural illumination through roof light whe......
Read More
Countdown Meadowbank, Meado...
October 3, 2017
TBC
...
Read More
Countdown Mt Wellington, Mt...
October 3, 2017
TBC
...
Read More
Mid City Centre, Auckland City
October 3, 2017
TBC
...
Read More
Stanmore Bay Retail, Auckland
October 3, 2017
This project comprises a mixed retail development including a Z Petrol Station.
...
Read More
Countdown Henderson, Auckland
October 3, 2017
This project consists of the internal refurbishment of the Countdown Henderson store. The work involves the installation of ne......
Read More
Countdown Waiheke Island, A...
October 3, 2017
This project consists of the construction of a new 3490sqm Countdown on Waiheke Island.
...
Read More
Countdown Airport, Auckland
October 3, 2017
This project consists of the internal refurbishment of the Countdown Airport store. The work involves the installation of new ......
Read More
The Warehouse, St Lukes, St...
October 3, 2017
TBC
...
Read More
Countdown Grey Lynn, Grey Lynn
October 3, 2017
All fitout works were completed within the original Watts & Hughes contract period.
...
Read More
Countdown Stoddard Rd, Mt R...
October 3, 2017
The work of this project included the demolition of an existing office warehouse structure and the erection of a new 4200 m2 su......
Read More
Bo Concepts, Mt Eden
October 3, 2017
TBC
...
Read More
Pukekohe Office & Retai...
October 3, 2017
This project consists of three levels of retail and office spaces with an adjoining car parking facility split over four levels......
Read More
The Parc, Auckland
October 3, 2017
The final complex includes 200 up-market apartments and two 4 level office buildings.
...
Read More
Omaha, Auckland
October 3, 2017
TBC
...
Read More
Imperial Garden, Auckland
October 3, 2017
This project included the demolition of the existing hotel and construction of a 12 storey residential apartment building inclu......
Read More
Hobson Heights, Auckland
October 3, 2017
TBC
...
Read More
Hanson Apartments, Auckland
October 3, 2017
TBC
...
Read More
H47, Auckland
October 3, 2017
This project comprises a 16 storey structure using precast floor and wall panels and aluminium glazing to apartment front eleva......
Read More
City Garden Apartments, Auc...
October 3, 2017
The work of this project comprised the construction of a 19-storey innercity apartment building on top of an existing car park ......
Read More
98 Remuera Road, Auckland
October 3, 2017
This project consisted of a four-storey apartment building housing 7 luxury apartments with basement car parking facilities.
...
Read More
Rendezvous Hotel Auckland -...
October 3, 2017
This contract involved the Refurbishment of 439 rooms which involved re-painting walls, a new mini bar and wardrobe doors, the ......
Read More
Chambers & Station Apar...
October 3, 2017
Chambers and Station, a heritage conversion of Mt Eden's former mayoral chambers and Mt Eden fire station prior to the incorpor......
Read More
464 Remuera Road, Auckland
October 3, 2017
This project conisist of the construction of a new high end residential apartment complex. Includes a 3 storey and a 6 storey ......
Read More
Jet Park Hotel, Auckland
October 3, 2017
Jet Park Hotel features a 250 person multi-storey conference complex and an additional 60 new guest rooms (“The Tower” above th......
Read More
Meadowlands Sports Centre, ...
October 3, 2017
This was a multi sports facility comprising of squash courts and tennis and softball club facilities with public amenities.
...
Read More
Rongomai Sports Centre, Sou...
October 3, 2017
This project consisted of a mixed sports facility comprising clubrooms and offices for football and softball clubs and includes......
Read More
Auckland Eye Clinic, Auckland
October 3, 2017
This project provides a new, stand alone facility for the Auckland Eye team in Remuera Auckland.
The contract ......
Read More
123 Remuera Road, Medical C...
October 3, 2017
A state of the art, bespoke architecturally designed Medical Centre including two levels below ground basement car parking, thr......
Read More
Silverdale Medical Centre, ...
October 3, 2017
The Silverdale Medical Centre is a modern, purpose-built facility offering a full range of medical services. This project compr......
Read More
Middlemore Telephony, Otahuhu
October 3, 2017
Construction comprised strip and spread footings founded on rock or engineered fill with precast, perimeter retaining walls. T......
Read More
Middlemore CSB, Otahuhu
October 3, 2017
This facility provides the kitchen and ancillary works for the entire hospital complex. Works include kitchen meal preparation ......
Read More
Shalom Court, St Johns
October 3, 2017
This project entailed a new 2 storey rest home with 12 ensuite bedrooms, a new high end commercial grade kitchen and laundry fa......
Read More
The Warehouse Distribution ...
October 3, 2017
The construction of a 55,000m2 North Island Distribution Cente warehouse.
...
Read More
The Total Logistics Company...
October 3, 2017
This project consisted of a large 13000sm logistics warehouse with attached two-level 4000sm office.
...
Read More
Storage Unlimited, Auckland
October 3, 2017
This was a brand new self storage facility.
...
Read More
NZ Window Shades, Auckland
October 3, 2017
The construction of a two storey office building with attached warehouse.
...
Read More
Mainfreight Whangarei, Auck...
October 3, 2017
This project comprised the construction of an office/warehouse.
...
Read More
Higgins Contractors, Auckland
October 3, 2017
This project included a two storey office block plus significant upgrade to yard and workshop areas.
...
Read More
TVNZ, Auckland
October 3, 2017
The work of this project comprised the refurbishment and making good of two elderly warehouse units adjacent to the TVNZ premis......
Read More
Trio Highbrook, Auckland
October 3, 2017
This project consisted of 3000m2 warehouse with 400m2 of office space. The construction was made up of Structural Steel; Pre ca......
Read More
Highbrook, East Tamaki
October 3, 2017
A Design and Build 6000m2 warehouse with 400m2 office area over two levels with extensive parking and landscaped areas. The pr......
Read More
Freshmax, Mt Wellington
October 3, 2017
Construction of a new office and warehouse building.
...
Read More
Pukekohe Reformed Church, P...
October 3, 2017
This project consisted of the demolition of the existing building and new build consisting a commercial and domestic mix which ......
Read More
CERES, Mt Wellington
October 3, 2017
Construction of a 5 Star, Green Star office and warehouse.
...
Read More
Clemow Drive, Canopy Additi...
October 3, 2017
This project consists of a covered canopy approx 1600m2 with precast boundary walls.
...
Read More
Autolign, Auckland
October 3, 2017
This project consisted of a single level office with attached warehouse with a gross area of 1600sqm.
...
Read More
BMW Extension, Mt Wellington
October 3, 2017
This project consisted of a two level office and warehouse addition with a gross area of 1500sqm.
...
Read More
Ice Building, Auckland
October 3, 2017
This project consisted of a 2750sqm warehouse and offices near the Auckland Airport.
...
Read More
Highbrook Drive - Building ...
October 3, 2017
This project consisted of the construction of a new 3 level 4200sqm office block.
...
Read More
Fonterra UHT Extensions Con...
October 3, 2017
This project was broken down into three separate sectional work faces, which required to be carried out at the same time. The p......
Read More
The Bluestone Store, Auckland
October 3, 2017
The Bluestone Store was built in 1851, is a Category A on the Historic Places Trust Register and has a “Preservation Orderâ€......
Read More
Hammerheads Restaurant, Auc...
October 3, 2017
This project comprised the alteration and addition to an existing historic building to provide accommodation for the Navy Leagu......
Read More
Allendale House, Auckland
October 3, 2017
This project consisted of the complete restoration of an 1881 bay-style villa in strict keeping with its original period and st......
Read More
Northern Animal Shelter, Si...
October 3, 2017
This contract provided a new animal welfare centre located at Silverdale, serving North Shore City and Rodney District Council.......
Read More
New Lynn Library, Auckland
October 3, 2017
This project comprised the construction of a new 1,000 m2 public library in New Lynn which consisted of structural steel frame,......
Read More
Manukau Police Hub Stages 1...
October 3, 2017
This work provided the construction of a new district Police Headquarters and detention facility.
This project was awarded u......
Read More
Mangere Arts Centre, Manuka...
October 3, 2017
The work of this project included a new Performing Arts Theatre and Art Galleries along with court yards, service rooms, office......
Read More
Barry Curtis Park, Auckland
October 3, 2017
The work of this project comprised small meeting room facilities for local groups as well as incorporating a viewing platform n......
Read More
Clendon Library, South Auck...
October 3, 2017
This work provided the construction of a new library facility at Clendon, adjacent to the original Clendon Library.This project......
Read More
Auckland High Court Custodi...
October 3, 2017
This project consists of major alterations and extensions to 4 floors of the Existing High Court historic building including th......
Read More
Manukau Police Hub Stage 3,...
October 3, 2017
Stage 3 phase of this project were carried out while the original station remained in full operation. Stage 3 was awarded to W......
Read More
Housing NZ - Reclad, Auckland
October 3, 2017
This project comprised of the complete removal of existing exterior cladding, making good to rotten timber, applying “frame sav......
Read More
Counties East Police Headqu...
October 3, 2017
This work provided the construction of a new district Police Headquarters in East Tamaki, Auckland and is an above average qual......
Read More
Manukau Courts, Manukau
October 3, 2017
This project included the construction of a new 4 level court facility as well as the upgrade and refurbishment of the existing......
Read More
Tupu Library, Flatbush
October 3, 2017
This project involved extending the existing library and service areas.
...
Read More
Parklane Apartments, Auckland
October 3, 2017
This project consisted of a residential refurbishment and additions to an existing office building to provide a new multi-level......
Read More
Francis Apartments, Auckland
October 3, 2017
This project involved the fitout of a complete level of the Metropolis.
...
Read More
Les Mills, Auckland
October 3, 2017
This project involved a fit out for Les Mills.
...
Read More
Franklin Law, Pukekohe
October 3, 2017
This project is a full fitout of new premises based in Pukekohe in the Campbell Tyson Centre. Install of services on design and......
Read More
Ports of Auckland Extension...
October 3, 2017
Infill of two upper floors between the feature core and external columns, with the addition of 1500m2 of new ground floor retai......
Read More
Central Cinema, Papatoetoe
October 3, 2017
This project was a conversion of the old cinema into retail space and office accommodation.
...
Read More
Scenic Hotel, Auckland City
October 3, 2017
Removal and replacement of existing roof membrane on Scenic Hotel, Queen Street, Auckland. The hotel remained in operation thr......
Read More
Force Entertainment Centre,...
October 3, 2017
This was a major project for Watts & Hughes undertaken from July 1998 to completion in Sept. 2000.
The project included......
Read More
Kauri Bay Farm Lodge & ...
October 3, 2017
Kauri Bay Boomrock. The Kauri Bay Lodge and Bunkers is located amongst the picturesque Clevedon countryside. The Lodge has th......
Read More
Whangaparaoa College Stg II...
October 3, 2017
The work of this project included the removal and re-cladding of all exterior walls and the complete refurbishment of the build......
Read More
Whangaparaoa College Stg I ...
October 3, 2017
This was a collaborative type contract with the Ministry of Education. The work of this project included the development of the......
Read More
Whangaparaoa College Stg I ...
October 3, 2017
This was a collaborative contract undertaken with the Ministry of Education to provide new educational facilities for the exist......
Read More
Sommerville School, Auckland
October 3, 2017
The construction of new classroom and amenities block.
...
Read More
Sacred Heart College: New M...
October 3, 2017
This project consisted of the construction of a new Middle School, a new Administration Building and a new Technology Block.
......
Read More
Parnell School, Auckland
October 3, 2017
This project provided new classroom and upgrading of 2 existing classrooms.
...
Read More
Blockhouse Bay School, Auck...
October 3, 2017
This project was a partial demolition of existing hall and construction of a new sports hall, reception area, kitchen and toile......
Read More
Avondale College, Avondale
October 3, 2017
This work provided the construction of a new canteen for Avondale College.
...
Read More
Carmel College, North Shore
October 3, 2017
This project consisted of the construction of classrooms including a 3 storey multi-use building comprising a theatre, library ......
Read More
Auckland Grammar, Auckland
October 3, 2017
This project consists of the construction a new classroom block which is located in the `heart’ of the campus to maximise effic......
Read More
Kaipara College, Helensville
October 3, 2017
The work of this contract consisted of extensions to the existing hall, staff room and library as well as new teaching Block C ......
Read More
Robertson Road School, Mangere
October 3, 2017
This project comprised the construction of a two storey, 8 classroom block.
...
Read More
Watts & Hughes Construc...
October 3, 2017
This was a design and build project comprising 4 storey and basement office development.
...
Read More
Vodafone Building, Auckland
October 3, 2017
The Vodafone project was a concrete frame structure with dycore precast flooring and structural steel framed roof. Roofing mate......
Read More
Rodney District Council Off...
October 3, 2017
New 3 storey office building for Rodney District Council.
This was a collaborative type contract which provided the construc......
Read More
Mastercard Building, Auckland
October 3, 2017
TBC
...
Read More
KPMG Centre, Auckland
October 3, 2017
This project comprised the construction of a new office building with underground car park garage.
This project occupies a p......
Read More
Deloitte Centre, Auckland
October 3, 2017
This project provided a nine-level premium quality office building including basement parking.
...
Read More
Building 4 - 107 Carlton Go...
October 3, 2017
Building 4 was the 4th in a series of similar style office towers erected by Watts & Hughes for the Symphony Group on Carle......
Read More
Pitango, Auckland
October 3, 2017
This project consisted the Pitango factory relocation; construction of office, warehouse and a specialised Cook Room.
...
Read More
Building D, Highbrook, Auck...
October 3, 2017
This project consisted of a 3 storey office development including suspended post tension slabs.
...
Read More
205 Great South Road, Auckland
October 3, 2017
This project consisted of a substantial make over of an existing building to change use and modernize to an office space spread......
Read More
Ingram Micro, Auckland
October 3, 2017
This project consisted of a two level office building with attached 2000m2 of electronic manufacturing facility.
...
Read More
EXEL Warehouse, Auckland
October 3, 2017
This project comprised new office and warehouse facilities for Exel (NZ Ltd) at Auckland International Airport.
...
Read More
Freshmax Ltd, Mt Wellington
October 3, 2017
This project for Freshmax Limited included 3 separate projects. The first project comprised approximately 3,000m2 of office an......
Read More
Patton Building, Auckland
October 3, 2017
This project consisted of the construction of a new office and warehouse development.
...
Read More
St Cuthberts School Under C...
October 3, 2017
The work at St Cuthbert’s College included a 1,400 sqm underground car park with net ball court over teh top valued at $1.6 mil......
Read More
Pakenham Street Car Park, A...
October 3, 2017
The Pakenham Street Car Park Building was a design & build project undertaken by Watts & Hughes Construction along with......
Read More
Commerce Street Car Park, A...
October 3, 2017
This project is a 10 storey car park structure constructed on a very restricted Auckland CBD site. The car park ramps extend o......
Read More
Pukekohe Retail development...
October 3, 2017
This project involved the construction of the Pukekohe Office and Retail development with an adjoining car park structure consi......
Read More
Middlemore Car Park, Otahuhu
October 3, 2017
This project was an addition of 2 floors of an existing car park building. The building was used extensively on the lower floo......
Read More
Countdown Stoddard Road, Mt...
October 3, 2017
The work of this project included a new 5000m2 underground carpark plus exterior carpark.
...
Read More
No results for your filters.