Addington Primary School
Watts & Hughes were engaged as the Main Contractor to complete the following construction works at Addington Primary School.
Stage One of the works involved a new Conductive Education Block and Hub 2. Specialist medical hoists & equipment was installed to deal with the requirements of the students. A complete kitchen install was completed with stainless steel tops and white goods. Multiple water closets were installed for the students and staff. We completed offices with internally glazed partitions, breakout rooms and classrooms with tiered seating areas.
Stage Two of the works involved the refurbishment of the Nga Manu (4ILE) / Library Block. This included Structural strengthening and an additional roofing structure added for structural strength. Complete re-fit of all internal space comprising of w.c’s, classrooms, office and breakout spaces inclusive of aluminium glazed partitions.
Stage Three of the works involved the refurbishment of rooms 9, 10 & 11, including new flooring and external asphalt finishes