Countdown The Palms 2022 Refit
The scoped refurbishment turned into a structural rebuild also of majority of the bulkheads and all ground floor suspended ceiling grid including all BOH areas.
New vinyl tile floors to main retail area. Epoxy floor touch ups to the fish area and a new Degafloor to BOH deli area.
New pharmacy was built to standard Countdown Specs and walls finishes installed where a mixture of timber, tiles, shadow clad, stainless steel and painted gib bulkheads.
New online area layout to front of store with automatic door s installed. One opening into the store the other into the mall. Elockers installed and the floor area was ground concrete with an anti-dusting Ardex clear coat installed.
The store was staged to allow the produce area to be handed back at an agreed date while the online store and main store where then to be completed. Full demolition of the areas meant a lot of time spent ensuring the areas cleaned for store opening but the team managed this well with protection and only a few issues with store presentation that where rectified and further controls added to ensure this was prevented in future.